Operational Constraints¶
Note
This is a template file that is associated with a template directory structure. This note should be deleted when the section is properly populated
This page defines the different types of operational constraints.
Operating conditions used to define the Rubin construction project are found in LTS-54.
As commissioning gets underway the operating conditions will be better constrained and different situations will apply to the Main telescope and Auxiliary Telescope.
Unrestricted Operating Conditions¶
Winds less than X km/h
Restricted Observing Conditions¶
Winds greater than X km/h Relative humidity greater than X% Dust count?
Vent Gate Configurations¶
Operations must be at elevations> Y degrees.
Moon Avoidance¶
Avoid the moon since it may damage the telescope.