Observing Run Planning

Note

This is a procedure template file that is associated with a template directory structure. This note should be deleted when the section is properly populated.

Overview

This is a template for a procedure. It is performed by authorized and trained users.

Prerequisites

  • This is an example bullet of a prerequisite (Telescope azimuth must be at 0 degrees.)
    • This is an example describing an exception (If the dome is closed, telescope elevation position is not important.)
  • This is another example bullet of a prerequisite (Notification to specified SLACK channel.)
  • This example refers to a required action at the beginning of the procedure (It is critical the correct status of the equipment. This will be verified during a critical step in the procedure.)

Post-Condition

  • This is an example bullet of a post-condition (Telescope azimuth is 0 degrees.)
  • This is another example of a post-condition (This procedure leaves the telescope with the E-stop activated.)

Procedure Steps

This paragraph describes some general guidance for this procedure. This paragraph is optional depending on its usefulness and the complexity of the procedure.

In the case of a very straightforward procedure, a simple numbered list could be used, like as follows:

Warning

For this example, this step is critical.

  1. This is Step 1 in a enumerated list. It happens to be very important.
  2. This is Step 2.
  3. This is step 3.
  4. Step 4 has two branches, but Step 5 is independent of Step 4.
    1. If Condition A, do the following action in Condition A Instructions.
    2. If Condition B, do the following action in Condition B instructions.
  5. Complete the procedure’s final step.

Condition A for Step 4

This is an example of a sub-section, used when Condition A applied. Complete the steps in this section:

  1. Step 1 for Condition A.
  2. Return to Step 5 in the section above.

Condition B for Step 4

This is an example of a sub-section, used when Condition B applied. Complete the steps in this section:

  1. Step 1 for Condition B.
  2. Return to Step 5 in the section above.

Troubleshooting

  • This is an example bullet (If the following error is given during Step 5, resolve it using a specified action.)

Contact Personnel

This procedure was last modified Jan 28, 2022.

This procedure was written by Name-of-Primary-Author. The following are contributors: List-of-contributors.