Skip to main content
Ctrl+K
Logo image Logo image

Observatory Operations

Site Navigation

  • Safety
  • Constraints
  • Simonyi
  • AuxTel
  • Observatory
  • Communication
  • Contribute
  • Setup
  • Rubin docs

Site Navigation

  • Safety
  • Constraints
  • Simonyi
  • AuxTel
  • Observatory
  • Communication
  • Contribute
  • Setup
  • Rubin docs

Section Navigation

  • ATCS
  • AT Calibrations System
  • LATISS
  • AuxTel Standard Operations
    • AuxTel Daytime Operations
      • Daytime Checkout
      • Prepare for vent
      • LATISS Combined Calibrations Generation Procedure
      • Prepare ATCS For Flat Fields
    • AuxTel Nighttime Operations
      • Beginning of the night: Center, absorb pointing offsets, mirror alignment and focus
      • Prepare for On-Sky Operations
      • Shutdown
  • AuxTel Non-standard Operations
    • AuxTel EUI Access
    • ATCS Non-standard procedures
      • AuxTel LOTO Procedure
      • E-Stop Procedure
    • LATISS Non-standard procedures
    • AT Calibration System Non-standard procedures
    • AuxTel Emergency Shutdown
  • AuxTel Troubleshooting
    • ATCS Troubleshooting
    • LATISS Troubleshooting
    • AT Calibration System Troubleshooting

AuxTel Non-standard Operations#

  • AuxTel EUI Access
  • ATCS Non-standard procedures
    • AuxTel LOTO Procedure
    • E-Stop Procedure
  • LATISS Non-standard procedures
  • AT Calibration System Non-standard procedures
  • AuxTel Emergency Shutdown

previous

Shutdown

next

AuxTel EUI Access

Edit this page

© Copyright 2015-2022 Association of Universities for Research in Astronomy, Inc. (AURA).

Built with the PyData Sphinx Theme 0.12.0.

Created using Sphinx 5.3.0.