Skip to main content
Ctrl+K
Logo image Logo image

Observatory Operations

Site Navigation

  • Safety
  • Daytime
  • Daytime/Nighttime Interactions
  • Nighttime
  • Non-Standard Operations
  • Trobleshooting
  • Contribute
  • Setup
  • Rubin docs

Site Navigation

  • Safety
  • Daytime
  • Daytime/Nighttime Interactions
  • Nighttime
  • Non-Standard Operations
  • Trobleshooting
  • Contribute
  • Setup
  • Rubin docs

Section Navigation

  • Introduction to Combined Calibrations Generation Procedure
  • Safety
    • Control Safety Systems
  • Auxiliary Telescope
    • AuxTel Calibrations
      • Enable LATISS
      • Prepare ATCS For Flat Fields Procedure
      • Latiss Combined Calibrations Generation Procedure
    • AuxTel Daytime Checkout
      • Daytime Checkout SAL Scripts
    • AuxTel E-Stop Procedure
      • E-Stop Procedure
    • AuxTel LOTO Procedure
    • AuxTel Daytime Venting
      • Prepare for vent
  • Main Telescope
    • MT Calibrations
      • ComCam Combined Calibrations Generation Procedure
      • Enable ComCam Procedure
      • Enable OCPS ComCam Procedure
    • MT Procedures
      • ComCam Cooldown (CCS-specific)
      • Refrigeration System - Pathfinder

Main Telescope#

Note

Under Construction

Procedures are divided into daytime calibrations and other daytime procedures.

Daytime Calibrations#

  • MT Calibrations
    • ComCam Combined Calibrations Generation Procedure
    • Enable ComCam Procedure
    • Enable OCPS ComCam Procedure

Daytime Procedures#

  • MT Procedures
    • ComCam Cooldown (CCS-specific)
    • Refrigeration System - Pathfinder

previous

Prepare for vent

next

MT Calibrations

On this page
  • Daytime Calibrations
  • Daytime Procedures
Edit this page

© Copyright 2015-2022 Association of Universities for Research in Astronomy, Inc. (AURA).

Built with the PyData Sphinx Theme 0.12.0.

Created using Sphinx 5.3.0.