Skip to main content
Ctrl+K
Logo image Logo image

Observatory Operations

Site Navigation

  • Safety
  • Daytime
  • Daytime/Nighttime Interactions
  • Nighttime
  • Non-Standard Operations
  • Trobleshooting
  • Contribute
  • Setup
  • Rubin docs

Site Navigation

  • Safety
  • Daytime
  • Daytime/Nighttime Interactions
  • Nighttime
  • Non-Standard Operations
  • Trobleshooting
  • Contribute
  • Setup
  • Rubin docs

Section Navigation

  • Weather Constraints
  • Scheduler Procedures
    • Scheduler Operational Scripts
    • Initializing the Scheduler CSC
    • Scheduler Night-time Operation
    • Additional Scheduler Operations
  • Observatory procedures
    • DIMM
      • DIMM Startup, Shutdown and Monitoring
  • Auxiliary Telescope
    • AuxTel Preparation
      • Prepare for On-Sky Operations
    • Auxtel On Sky
      • Beginning of the night: Center, absorb pointing offsets, mirror alignment and focus
    • AuxTel Shutdown
      • Shutdown
  • Main Telescope
    • MainTel Preparation
    • MainTel On Sky
    • MainTel Shutdown

Main Telescope#

Note

Under construction.

Procedures are displayed into preparation, on-sky and shutdown:

Preparation#

  • MainTel Preparation

On-sky#

  • MainTel On Sky

Shutdown#

  • MainTel Shutdown

previous

Shutdown

next

MainTel Preparation

On this page
  • Preparation
  • On-sky
  • Shutdown
Edit this page

© Copyright 2015-2022 Association of Universities for Research in Astronomy, Inc. (AURA).

Built with the PyData Sphinx Theme 0.12.0.

Created using Sphinx 5.3.0.