Summit Devices Shutdown and Recovery#

Outside the computer room numerous devices need to be powered off and subsequently recovered following a site shutdown

The following is a list of the devices that should be recovered:

  • First Floor: Shaft PDU + Switches

  • Second Floor: Computer room

  • Third Floor: Coating PDU + Switch, Camera Switches

  • Fifth Floor: Electric PDU + Switch

  • Auxtel: 2xAuxtel PDU + Switch

  • External to Building: Casino, EIE, PeƱon Switches