Skip to main content
Ctrl+K
Logo image Logo image

Observatory Operations

Site Navigation

  • Safety
  • Constraints
  • Simonyi
  • AuxTel
  • Observatory
  • Communication
  • Contribute
  • Setup
  • Rubin docs

Site Navigation

  • Safety
  • Constraints
  • Simonyi
  • AuxTel
  • Observatory
  • Communication
  • Contribute
  • Setup
  • Rubin docs

Section Navigation

  • ATCS
  • AT Calibrations System
  • LATISS
  • AuxTel Standard Operations
    • AuxTel Daytime Operations
      • Daytime Checkout
      • Prepare for vent
      • LATISS Combined Calibrations Generation Procedure
      • Prepare ATCS For Flat Fields
    • AuxTel Nighttime Operations
      • Beginning of the night: Center, absorb pointing offsets, mirror alignment and focus
      • Prepare for On-Sky Operations
      • Shutdown
  • AuxTel Non-standard Operations
    • AuxTel EUI Access
    • ATCS Non-standard procedures
      • AuxTel LOTO Procedure
      • E-Stop Procedure
    • LATISS Non-standard procedures
    • AT Calibration System Non-standard procedures
  • AuxTel Troubleshooting
    • ATCS Troubleshooting
    • LATISS Troubleshooting
      • AT camera recovery
      • ATSpectrograph failed - grating stage position and timed out
    • AT Calibration System Troubleshooting

AuxTel Nighttime Operations#

Standard operations during a scheduler-driven observation night.

  • Beginning of the night: Center, absorb pointing offsets, mirror alignment and focus
  • Prepare for On-Sky Operations
  • Shutdown

previous

Prepare ATCS For Flat Fields

next

Beginning of the night: Center, absorb pointing offsets, mirror alignment and focus

Edit this page

© Copyright 2015-2022 Association of Universities for Research in Astronomy, Inc. (AURA).

Built with the PyData Sphinx Theme 0.12.0.

Created using Sphinx 5.3.0.