Vera C. Rubin Observatory Operations Documentation
  • Forum
  • Docs
  • LSST.org →

Navigation

  • next »
  • « previous |
  • Vera C. Rubin Observatory Operations Documentation »
  • Nighttime Operations

Nighttime Operations¶

Weather Constraints¶

Operations contraints due to weather are described in this section.

  • Weather Constraints

Scheduler¶

  • Scheduler Procedures
    • Scheduler Operational Scripts
    • Initializing the Scheduler CSC
    • Scheduler Night-time Operation
    • Troubleshooting the Scheduling Algorithm
    • Additional Scheduler Operations

Observatory¶

  • Observatory procedures
    • DIMM
      • DIMM Startup, Shutdown and Monitoring
    • Weather Station
      • Start Up

Auxiliary Telescope¶

  • Auxiliary Telescope
    • AuxTel Preparation
      • Exposure Logger
      • Open for On-Sky Observations
    • Auxtel On Sky
      • Absorb pointing offsets
      • CWFS
    • AuxTel Shutdown
      • Shutdown
      • Park the Telescope

Main Telescope¶

  • Main Telescope
    • MainTel Preparation
      • Open for On-Sky Operations
    • MainTel On Sky
      • Absorb pointing offsets
    • MainTel Shutdown
      • Shutdown
      • Park the Main Telescope

On this page

  • Nighttime Operations
    • Weather Constraints
    • Scheduler
    • Observatory
    • Auxiliary Telescope
    • Main Telescope

  Back to Top

Created using Sphinx 5.3.0. Page design is based on Astropy's bootstrap-astropy theme in astropy-helpers.
LSST documentation is proudly served through the Fastly CDN.

© Copyright 2020 Association of Universities for Research in Astronomy (AURA), Inc..

Financial support for LSST comes from the National Science Foundation (NSF) through Cooperative Agreement No. 1258333, the Department of Energy (DOE) Office of Science under Contract No. DE-AC02-76SF00515, and private funding raised by the LSST Corporation. The NSF-funded LSST Project Office for construction was established as an operating center under management of the Association of Universities for Research in Astronomy (AURA). The DOE-funded effort to build the LSST camera is managed by the SLAC National Accelerator Laboratory (SLAC).