Vera C. Rubin Observatory Operations Documentation
  • Forum
  • Docs
  • LSST.org →

Navigation

  • next »
  • « previous |
  • Vera C. Rubin Observatory Operations Documentation »
  • System Testing, Deployments, and Upgrades

System Testing, Deployments, and Upgrades¶

  • Tucson Test Stand (TTS)
  • Announcing Component Usage
  • Testing A CSC At The Summit
  • Control System Upgrade
    • Upgrading the Interface (XML)
    • Upgrading SAL
    • Upgrading DDS (OpenSplice)
    • Setting a Schedule
    • Preparing for Deployment
    • Deployment Configuration Repositories
    • Deployment Helper Repositories
    • Site Specific Variations
    • Deploying the Upgrade
    • Site Specific Variations
  • TSSW Build Procedures
    • TSSW Build System

On this page

  • System Testing, Deployments, and Upgrades

  Back to Top

Created using Sphinx 5.3.0. Page design is based on Astropy's bootstrap-astropy theme in astropy-helpers.
LSST documentation is proudly served through the Fastly CDN.

© Copyright 2020 Association of Universities for Research in Astronomy (AURA), Inc..

Financial support for LSST comes from the National Science Foundation (NSF) through Cooperative Agreement No. 1258333, the Department of Energy (DOE) Office of Science under Contract No. DE-AC02-76SF00515, and private funding raised by the LSST Corporation. The NSF-funded LSST Project Office for construction was established as an operating center under management of the Association of Universities for Research in Astronomy (AURA). The DOE-funded effort to build the LSST camera is managed by the SLAC National Accelerator Laboratory (SLAC).