Skip to main content
Ctrl+K
Logo image Logo image

Observatory Operations

Site Navigation

  • Safety
  • Daytime
  • Daytime/Nighttime Interactions
  • Nighttime
  • Non-Standard Operations
  • Trobleshooting
  • Contribute
  • Setup
  • Rubin docs

Site Navigation

  • Safety
  • Daytime
  • Daytime/Nighttime Interactions
  • Nighttime
  • Non-Standard Operations
  • Trobleshooting
  • Contribute
  • Setup
  • Rubin docs

Section Navigation

  • Weather Constraints
  • Scheduler Procedures
    • Scheduler Operational Scripts
    • Initializing the Scheduler CSC
    • Scheduler Night-time Operation
    • Additional Scheduler Operations
  • Observatory procedures
    • DIMM
      • DIMM Startup, Shutdown and Monitoring
  • Auxiliary Telescope
    • AuxTel Preparation
      • Prepare for On-Sky Operations
    • Auxtel On Sky
      • Beginning of the night: Center, absorb pointing offsets, mirror alignment and focus
    • AuxTel Shutdown
      • Shutdown
  • Main Telescope
    • MainTel Preparation
    • MainTel On Sky
    • MainTel Shutdown

Observatory procedures#

More generic observatory procedures are included in this section.

DIMM#

  • DIMM
    • DIMM Startup, Shutdown and Monitoring

Weather Station#

previous

Additional Scheduler Operations

next

DIMM

On this page
  • DIMM
  • Weather Station
Edit this page

© Copyright 2015-2022 Association of Universities for Research in Astronomy, Inc. (AURA).

Built with the PyData Sphinx Theme 0.12.0.

Created using Sphinx 5.3.0.