Summit Devices Shutdown and Recovery¶
Outside the computer room numerous devices need to be powered off and subsequently recovered following a site shutdown
The following is a list of the devices that should be recovered:
- First Floor: Shaft PDU + Switches 
- Second Floor: Computer room 
- Third Floor: Coating PDU + Switch, Camera Switches 
- Fifth Floor: Electric PDU + Switch 
- Auxtel: 2xAuxtel PDU + Switch 
- External to Building: Casino, EIE, Peñon Switches